Another update on the progress of the loft layout:
Re-aligned and Replaced Mainline
I removed a slight jog from the foreground (left) track, and
replaced the vintage section of track with smoother Peco flex track to improve
the alignment of the track (right). The push pins show where the work was
actually done...
Preparation for crossover and freight house siding
As part of the work to improve operation interest and
facilitate the replacement of the vintage flex track, I cut the gaps for the
turnouts into the mainline. The goal was to complete the preparation work for
switch motors as well...
One switch motor mounting pad (of two)
...unfortunately I only manage to get one complete before
time ran out, so I will need to do the other when I place the turnouts.