Tuesday, January 4, 2011

Well, connected...

My "Golden Spike" moment:

I felt I needed something to celebrate the joining of the loop. Didn't have enough time to run many trains or do much else. Soon...


The last stretch of track



The pins are holding it until the PVA dries. Next visit I hope to double-track this section at least to have both mains running, now that the heavy engineering is figured out...


The long run through the yard


This is the main through the station area; the platforms will be to the left of this track, and the freight yard to the right. I am toying with options to add another arrival/departure track in this area since I can fit another track in to the plan…

Next installment: some action!

No comments:

Post a Comment